Eaton EVMA4609X-06 3-Phase Managed PDU 208V 42 Outlets 48A 17.3kW 460P9W 6ft 0U
Distributes 208 V three-phase power across 42 outlets with 48 A and 17.3 kW capacity, managed monitoring and 0U vertical mounting
- 208 V three-phase power feeds 42 outlets for dense server racks
- 48 A and 17.3 kW capacity handles heavy compute loads
- 0U vertical mounting preserves every rack unit for equipment
- 6 ft cord with 460P9W connector allows flexible cabinet placement
- Managed monitoring gives real-time visibility into power consumption per outlet
Three-Phase 208V Managed PDU
The Eaton EVMA4609X-06 distributes three-phase 208V power across 42 outlets in a 0U vertical form factor. It supports a total load of 48A and 17.3kW for high-density server cabinets. A 460P9W input connector and 6 ft cord complete the package.
Suited for data centres needing monitored
This unit fits cabinets that can terminate a 460P9W plug and supply 48A three-phase power. Facilities limited to single-phase feeds or lower amperage service cannot use it without electrical upgrades. Buyers without network management infrastructure lose the monitoring benefit.
460P9W input connector decides fit
The 460P9W plug requires a matching receptacle on the facility side. Verify that the upstream circuit provides three-phase 208V at 48A with this exact connector before ordering.
How it compares
Measured against everything we stock in Rackmount PDUs, at today’s prices. Recalculated every night.
- Price $2,664.99
- Pricier than about 92% of the 643 comparable items (median $451.99).
New to this? Which coin should you pay with — what to check, what it costs to pay, and what is never asked for.
Specifications
No published specifications for this item yet.
Questions about this item
How do I mount the 0U vertical PDU in a server cabinet, and what is the common mistake?
Secure the unit vertically along the rack’s 0U channel using the supplied brackets; the frequent error is leaving the mounting screws loose, which lets the 6 ft cord pull the PDU out of alignment.
Which component will need replacement first during long-term operation?
The IEC outlet modules are the primary wear items; after thousands of insertion cycles the contact springs fatigue and should be swapped to maintain reliable 208V 3-phase delivery.
What limit appears first when the PDU runs continuously at full load?
The 48A / 17.3kW aggregate rating is the first ceiling; sustained draw at that level trips the internal branch circuit protection before any thermal or connector limit is reached.
More in Rackmount PDUs
Similar items
APC AP8867 Metered Three-Phase PDU 208V 60A 30 C13 0U
- 0U
- Installation guide,…
CyberPower CPS1215RM 120V 15A Basic PDU 10 Outlets 15ft NEMA 5-15P 1U
- 1U
- 1U
APC APDU10452ME Metered PDU 3Phase 17.3kW 208V 60A 42 Outlet
- Metered
Tripp Lite PDUMV20 Metered PDU 20A 28 Outlets 120V 15ft 0U Vertical
- 0U
- 120 V
APC AP8866US Metered 0U PDU 17.3kW 208V 3‑Phase 60A 6 C13 12 C19
- PDUs & Line Conditi…





